Blower Door Test, Cold Storage Facility

Blower Door airtightness testing and air leakage detection for a −20°C cold storage facility at an industrial plant near Barcelona.

Cold Storage Facility Blower Door Test, Barcelona

Blower Door

Praxis cabecera proyectos

Description

Praxis Resilient Buildings carried out a Blower Door airtightness test on a cold storage facility at an industrial plant in Lliçà d’Amunt, Barcelona. The tested area was a freezer room designed to operate at −20°C, with an internal volume of 119.79 m³ and an envelope area of 148.28 m².

Significant ice build-up had been occurring on the internal walls and ceiling due to the infiltration of warm, moisture-laden air from adjacent areas. The objective of the test was to measure the freezer room’s overall air permeability, locate the principal air leakage paths and recommend targeted remedial measures.

The test was performed under depressurisation in accordance with ISO 9972, using calibrated fan pressurisation equipment. At a reference pressure of 50 Pa, the measured air leakage rate was 163 m³/h, equivalent to an air permeability of qE50 = 1.10 m³/(h·m²) and an air change rate of n50 = 1.36 h⁻¹. The test data met all ISO 9972 validity requirements, including those relating to the pressure range, number of measurement points, airflow exponent and coefficient of determination.

The measured air permeability was slightly above the project target of qE50 ≤ 1.00 m³/(h·m²), established with reference to BSRIA Specification 10/98. A detailed air leakage investigation was therefore undertaken using a hot-wire anemometer and thermal imaging camera. Air leakage was identified around the pressure-relief fan, sliding entrance door, corner finishing profiles and shelving brackets. Targeted sealing recommendations established clear priorities for remedial airtightness work, with the aim of reducing moisture ingress and ice formation while improving temperature control, thermal performance and operational efficiency.

  • Year: 2025
  • Location: Lliça d’Amunt, Barcelona
  • Services: Blower Door

Barcelona office Blower Door tests

Blower Door tests in a Barcelona office building, identifying air leakage in staircase and lobby pressurisation systems to support fire safety.

Barcelona office Blower Door tests

Blower Door

Praxis cabecera proyectos

Description

Blower Door testing of staircase and lobby pressurisation systems in a Barcelona office building

Praxis carried out six Blower Door airtightness tests in an office building located on Passeig de Gràcia in central Barcelona. The tests assessed the main staircase and five basement lobbies connected to two mechanical pressurisation systems.

Staircase pressurisation systems are an important part of a building’s fire-safety strategy. By maintaining positive pressure within protected escape routes, they help prevent smoke from entering during a fire. However, excessive air leakage through doors, construction joints or ventilation ducts can prevent the system from achieving the required pressure difference.

The tests were conducted in pressurisation mode in accordance with ISO 9972. Smoke testing and an anemometer were used at approximately 50 Pa to locate leakage paths, followed by multi-point measurements to quantify airflow.

In the staircase, the main air leakage occurred through the rooftop smoke vents and their perimeter frames, accounting for approximately 38% of the measured airflow at 50 Pa. In the basement lobbies, leakage was identified around timber panelling, construction junctions, ventilation grilles, drop seals and sliding fire-resistant doors. The investigation identified priority airtightness improvements to enhance the reliability of the pressurisation systems and support fire safety.

  • Year: 2022
  • Location: Passeig de Gracia, Barcelona
  • Services Blower Door

Blower Door test in La Nou de Gaià

Description Blower Door airtightness test to the EN ISO 9972 standard for the verification of whole building airtightness, as part of the construction of a detached single-family home in La Nou de Gaià, Tarragona, designed to PHI Low-energy building standard. The house was designed by Divers Arquitectura. Two tests were carried out: during construction phase, …

Blower Door test in La Nou de Gaià

Blower Door

Praxis cabecera proyectos

Description

Blower Door airtightness test to the EN ISO 9972 standard for the verification of whole building airtightness, as part of the construction of a detached single-family home in La Nou de Gaià, Tarragona, designed to PHI Low-energy building standard.

The house was designed by Divers Arquitectura.

Two tests were carried out: during construction phase, and following completion. For the preliminary test, leaks were detected with a handheld smoke generator and anemometer. 

The final result of N50=0.99 ach, is well below the minimum requirements of the Spanish building regulations CTE DB HE-1 2019 of N50 = 6 ach. 

  • Year: 2021
  • Location: La Nou de Gaià, Tarragona
  • Services: Blower Door

Terrassa Hospital Blower Door tests

Blower Door airtightness testing in 17 isolation ward rooms at Hospital de Terrassa, Barcelona, to EN 13829 / ISO 9972 for infection-control risk assessment.

Terrassa Hospital Blower Door tests

Blower Door

Praxis cabecera proyectos

Description

Blower Door Airtightness Testing in Hospital Isolation Rooms — Hospital de Terrassa, Barcelona

Praxis carried out Blower Door airtightness tests in 17 hospital bedrooms in the isolation ward of the Hospital de Terrassa, Barcelona, as part of the verification of spaces designed to accommodate patients with infectious diseases.

The objective of the testing was to measure the air permeability of individual isolation rooms and support an assessment of the potential risk of aerosol contamination between rooms and adjacent hospital areas. The test strategy was informed by BSRIA BTS 3/2018 — Air Permeability Testing of Isolation Facilities, which provides guidance for assessing air leakage in isolation facilities.

Testing methodology

The airtightness tests were carried out using fan pressurisation equipment in accordance with EN 13829 (now superseded by ISO 9972). Each room was tested in both depressurisation and pressurisation, with measurements taken between approximately 20 Pa and 70 Pa.

Results

The results were considered satisfactory, with no room showing excessive air permeability according to the project assessment. The testing provided useful evidence for the commissioning and risk assessment of the isolation ward, supporting the control of unintended air leakage paths between patient rooms and surrounding hospital spaces.

This type of airtightness testing helps support infection-control strategies, ventilation commissioning, and risk assessment for airborne contamination in healthcare environments.

  • Year: 2021
  • Location: Terrassa, Barcelona
  • Services: Blower Door

Blower Door test in Viladecans

Whole-building blower door test (EN 13829 / ISO 9972) for an EnerPHit deep retrofit in Viladecans, Barcelona. Final N50 = 0.55 h⁻¹.

Blower Door test in Viladecans

Blower Door

Praxis cabecera proyectos

Description

Blower Door Airtightness Test (EN 13829 / ISO 9972) — EnerPHit Deep Retrofit in Viladecans, Barcelona

As part of a deep energy retrofit of a single-family terraced home in Viladecans (Barcelona), we carried out a whole-building airtightness assessment using a Blower Door test in accordance with EN 13829 (now superseded by ISO 9972). The testing verified the building envelope performance and supported certification to the Passivhaus EnerPHit standard.

The project was designed by Daniel Tigges (Tigges Architekt) and achieved EnerPHit certification, demonstrating excellent airtightness and high-performance retrofit detailing.

Two-stage airtightness testing

To ensure robust results and enable targeted improvements, two Blower Door tests were completed:

  1. Preliminary test (during construction):
    Air leakage paths were identified and traced using a handheld smoke generator and anemometer, allowing the team to locate and address leaks before finishes were completed.
  2. Final test (upon completion):
    The completed dwelling was retested to confirm airtightness targets and overall envelope integrity.

Result

The final measured airtightness was:

N50 = 0.55 h⁻¹ This result is well below the minimum requirements of Spanish building regulations (CTE DB HE-1 2019) and is approximately 45% better than the EnerPHit limit for existing buildings (N50 ≤ 1.0 h⁻¹). In practice, this level of airtightness supports improved thermal comfort, reduced uncontrolled ventilation heat loss, and more predictable ventilation performance.

  • Year: 2021
  • Location: Viladecans, Barcelona
  • Services: Blower Door