Offices in Cornellà: 3D thermal bridge calculation
LEED office building: steel beams crossing the façade, heat loss and mould risk.
Offices in Cornellà
3D thermal bridge calculation


Description
For Wattega we calculated a 3D point thermal bridge in an office building at design stage in Cornellà de Llobregat (Barcelona) that is pursuing LEED certification. In the detail, structural steel beams pass through the façade and interrupt the insulation; the connection includes a stainless steel thermal break element.
We modelled the detail in 3D to EN ISO 10211, after a 2D calculation of the U-value of the plain façade: U = 0.192 W/m²K. We used 0 °C outside, below the mean of the 12 coldest hours of the year in Barcelona (1.4 °C), and 20 °C inside.
The point thermal bridge coefficient is Χ = 0.360 W/K. That is far above the 0.01 W/K target for efficient construction, which is normal where a structural element crosses the envelope; the thermal break keeps it at an acceptable value. The moisture criterion therefore governs: the minimum internal surface temperature is 14.4 °C (fRsi = 0.72), above the 12.6 °C (fRsi ≥ 0.63) at which mould becomes a risk at 20 °C and 50% relative humidity, to EN ISO 13788.
The detail is free of condensation and mould risk provided it is built as drawn, with an airtight internal seal that stops warm, moist air reaching the cold parts of the wall, and with adequate ventilation of the spaces.





Thermal bridge calculations and images: Praxis Resilient Buildings.

































































